当前位置: 迅达文档网 > 党团工作 >

VALLOUREC,&,MANNESMANN,TUBES曼内斯曼油套管国内合作管材加工商内审资料(安东)

| 来源:网友投稿

 1

 Plant is located in Luntai, XinJiang province (2 hours by car from Korla). Several buildings in a large area which include pipe yard.

 Company is totally private, and have 11 owners, all working in the company.

 Total number of people is 89 in Luntai.

  Machining equipment for pipes:

  No CNC lathe at present. Remark: 2 CNC lathes will arrive in January 2006 (Shenyang- 13 3/8” CNC Fanuc) but for the new plant in Korla..

  3 manual lathes available (Shenyang), all less than 3 years old, in good shape). Hollow spindle maxi: 350 mm (13 3/8”).

 NC

  CAR1

 2

 Surface treatments

 Phosphating No phosphating hot process.

  Bead blasting: No equipment for blasting the pin. Equipment available but is using materials not recommended on VAM (VAM require AL2O3

 or Ceramic Bead).

  Copper plating: no equipment

  NC

 CAR2

  Bead blasting (with Aluminum oxide Al203 or ceramic bead ) is required on high chrome (above 22 %) or CRA VAM pin

  Copper plating required on 9 or 13 Cr and higher VAM box

 3

 Swaging, expanding and stress relieve

 No equipment for swaging, expanding nor stress relieve.

  NC

  CAR3

  (Depending the ratio of swaging and the grade, stress relieve may be required after swaging).

 4

 Make-up

 Make – up TEDA YNS 200/15 available (maxi 7”) but no torque/turn system available.

  NC

  CAR4

  Torque / turn system mandatory for making – up of VAM connections. Size limited to 7”. 5

 Quality system requirements Certified ISO 9000-2000 ad API Q1and 5CT.

 C

  6

 Quality Control equipment

 Inspection equipment located in a gauge room (separated from the workshop).

 All required API 5B equipment available except: - run out gauge - balls of size 5.08 and 8.89 mm - setting block for lead gauge with buttress profile - MRP 2000 type - PN 3000 - depth gauge with balls

 Profile projector with lenses x20 and x50 not available

  Calibration system: system exists but seen that some gauges out of calibration are still used. System therefore to improve.

 Equipment to check roughness not seen (in calibration outside)

  NC

 NC

 NC

  CAR5

 CAR6

 CAR7

 7

 Internet equipment

 Equipment available. No problem expected for loading document through Internet.

  C

 21, rue de Leval postal adress B.P. 1

  Beijing Antonoil Engineering & Technology Co 59620 Aulnoye-Aymeries, France

 phone

 : +33 3 27 69 66 15

 Tongao

 Luntai

 XinJiang fax

 : +33 3 27 66 45 75

 web site : www.vamservices.com

  PR China

  Attn.:

 Li Bing Nan

  Aulnoye-Aymeries the 24 August 2005 REF.: JD/05-113

  Dear Sir,

 Please find attached the audit report regarding the VAM License of your workshop of Tongao Luntai XinJiang, which has been conducted on 24 August 2005. I would like to thank all people of Beijing Antonoil Engineering & Technology Co met for their time, attention and welcome. Please return the observation / corrective actions sheets within one month after receipt of the present report with your proposed action and the date of completion. Please note that I will be your contact until the next audit. Should you need further information, please do not hesitate to contact me.

 Best regards.

 ________________________ Jose Decoster VAM Services QA Manager

 VALLOUREC MANNESMANN OIL & GAS FRANCE : société anonyme au capital 9 048 000 € Siège social : 54 rue Anatole France, 59620 Aulnoye-Aymeries, France Siren 384 627 170 RCS

 Avesnes - No de T.V.A. : FR 77 384 627 170

  Date 24 August 2005

 Ref.

 VS-JD/05-113

 FROM

  Jose Decoster TO

 A. Lancry-> H. Belmalek

  VMOGF J Pinto, T. Joss

  VMOGF L. Ma, B. De Rotalier

 VM Beijing FD > JD > CDB > MLS

 >

 OM

 > CG

  VAM Services

 LICENSEE AUDIT REPORT OF: Beijing Antonoil Engineering & Technology Co Tongao

 Luntai

 XinJiang PR China 24 August 2005

  +

 Nice facility seen in the workshop own by Antonoil through their 100 % affiliate "XinJiang Tongao Oilfield Technology", located in the city of Luntai, 2 hours drive west of Korla, Xinjian. Plant is very clean, well ordered. They have 3 main activities: Drill pipe repair, tubing repair, internal coating. They will shortly have another activity: casing repair, and for that will build in Korla a new workshop that will be equipped with 2 new CNC machines. This new shop should open in February 2006. They have good relationship with all oil company in the area: Petro China and Sinopec. They have a contract for 6 years for casing surface 20" and 18 5/8" with Tarim for 6 years.

 -

 Many equipment are missing: no CNC machine, no phosphating, no profile projector, no Gauge Maker equipment, no torque-turn at make up-machine: huge work shall be done.

  Conclusion: Qualify the plant in Luntai will require a lot of investment, including a new CNC lathe. They will wait our decision for the licence before to invest in Luntai. I have suggested to consider the qualification of the new plant in Korla that should be operational at beginning of 2006, and which be equipped with CNC lathes. In that case, investment will be not so heavy . They will investigate this possibility.

  Workshop description Several buildings. Production in a building

 50 x 20 meters. Current activity and forecast Threading and

 repair

 of API casing, tubing and drill pipes.

 Internal coating of tubing and casing. Threading activity/customers API , for local customer in Tarim area (PetroChina, Sinopec). Relationship with VAM Services or V&M representative None VAM copies o Competitors One: Tarim Oilfield workshop, in Korla Equipment 3 manuals lathes Shenyang (maxi hollow spindle 13 3/8"), no CNC lathe. No phosphating, nor profile projector e-Dispatching ok Gauges Some API 5B gauges missing. No gauge maker equipment. Inserts CTRI China Market needs n/a Miscelaneous n/a

  ref .: VS-JD/05-113

  VAM Audit Report Beijing Antonoil Engineering & Technology Co Workshop : Tongao

 Luntai

 XinJiang

  Country : PR China Pre-licence appraisal AUDIT REPORT

 From: Jose Decoster

  To : Li Bing Nan Copy :

  A. Lancry-> H. Belmalek

  VMOGF J Pinto, T. Joss

  VMOGF L. Ma, B. De Rotalier

 VM Beijing FD > JD > CDB > MLS

 >

 OM

 > CG

  VAM Services e-mail :

 libn@antonoil.com

 Date of the audit: On 24 August 2005.

  Audit team:

 José Decoster

 Persons met

 Opening meeting :

 Li Bing Nan, R. Dai & all manager Closing

 meeting :

 Li Bing Nan, R. Dai & all manager Aim of the audit :

 To evaluate the ability of Antonoil, Luntai, to become a VAM licensee. Reference documents : Pre-licence appraisal

 Conclusion : This visit has been done in order to make a tour of the plant of Antonoil-Tongao in Luntai, which has been found very clean, ordered and managed by a professional team. About the possibility to produce VAM in Luntai, several equipment are missing, specially a CNC lathe, but several other equipment which are listed in annex. As discussed during the visit, as Antonoil is setting a new plant in Korla, which will be equipped with CNC machine, and which should be operational at beginning of 2006, the possibility to produce VAM in this new plant may be preferably considered.

  Audit report prepared by :

  approved by : Name :

 Jose Decoster Name :

 Francois David Date :

  7 September 2005 Date

  :

 8 September 2005

  ?? VALLOUREC & MANNESMANN TUBES VALLOUREC & MANNESMANN TUBES OCTG Division Services

 The main verifications made during the audit can be found in the following pages.

 Definitions:

 Corrective action request (CAR) means that the VAM Licensee shall propose and perform the necessary actions to correct a non-conformance and to reduce as much as possible the risk of recurrence.

  The VAM licensee shall fill in the documents

 Corrective action request

 which are included in this report and return them to VAM Services

 within a month.

  Attachments

 Results of this audit for each TSLI - 7 - corrective actions requests resulting from this audit. -

 0- observations resulting from this audit.

推荐访问:安东 套管 管材

热门排行

党委党组落实全面从严治党主体责任规定指出本地区本单位发生重大违纪违法案件14篇

党委党组落实全面从严治党主体责任规定指出本地区本单位发生重大违纪违法案件14篇党委党组落实全面从严治党主体责任规定指出本地区本单位发生重大违纪违法案件篇1我

2022年五星支部创建实施方案5篇

2022年五星支部创建实施方案5篇2022年五星支部创建实施方案篇1为切实提高支部党建工作科学化水平、不断夯实党建基础,挖掘支部党建特色,创新支部党建工作做

七言绝句古诗精选【十首】

【 能力训练 导语】七言绝句是中国传统诗歌的一种体裁,简称七绝,属于近体诗范畴。此体全诗四句,每句七

2022年支部党员大会记录内容14篇

2022年支部党员大会记录内容14篇2022年支部党员大会记录内容篇120xx年度我校新党员发展工作已经开始。根据学校党委3月21日会议精神,今年新党员发展

统计工作如何为企业管理服务

作为企业管理重要组成部分的统计工作,在企业的经济运行中发挥着信息、咨询和监督三大作用,它为企业的经营

乡镇创建无毒社区工作方案

一、指导思想以“三个代表”重要思想为指导,认真贯彻落实上级精神,以禁吸戒毒为中心,全面落实禁毒工作责

四年级我家菜园日记500字

菜园子,就是种菜的地方。种菜的时候为了防止家禽进入菜地,于是农夫用篱笆或者栅栏将菜地围起来形成的一个

哈尔移动城堡电影观后有感范本

在观看完一部作品以后,相信你会有不少感想吧,这时我们很有必要写一篇观后感了。可能你现在毫无头绪吧,下

党支部2022年学习计划14篇

党支部2022年学习计划14篇党支部2022年学习计划篇1认真坚持“三会一课”制度,对于加强支部建设,提高党的战斗力、健全党的生活,严格党员管理,充分发挥党